Mobilisation of equipment.
To be effective a drilling machine needs to be able to access the drill site easily without time delay and high expense however equal consideration needs to be given to carriage all the other essential items required to complete the borehole construction.
Note
- If Mud Drilling a typical hole might require 3 10,000 litres of water hauled to drill site (or piped from a convenient source)
- When drilling with Down the hole hammer most compressor units outweigh the PAT drilling machine they complement.
- Well casing, screen, gravel pack and well apron construction materials all have to be efficiently hauled to site.
|